第1題: Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B. design phase
C. implementation phase
D. maintenance phase
(2)A. main symptom
B. root problem
C. final blueprint
D. data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement
下列選項中,項目經理 進行成本估算時不需要考慮的因素是( ).
A.人力資源
B.工期長短
C.風險因素
D.盈利
The strategies for handling risk comprise of two main types:negative risks, and positive risks.The goal of the plan is to minimize threats and maximize opportunities.When dealing with negative risks,there are three main response strategies( ),Transfer ,Mitigate .
A.Challenge
B.Exploit
C.Avoid
D.Enhance
某ERP軟件開發(fā)項目共有12個模塊,項目經理對較件進行了成本預算,預算每個模塊的開發(fā)成本為5萬元,按照項目管理計劃,每月開發(fā)一個模塊,12個月完成開發(fā)工作。在項目進行到第3個月底的時候,項目經理對照計劃,發(fā)現(xiàn)剛完成了2個模塊的開發(fā)工作,經統(tǒng)計,實際花費的成本為15萬元。若按照目前的績效情況,到所有模塊開發(fā)完成時預計托費的總成本為( )。
A.90萬
B.75萬
C.70萬
D.66.7萬
根據《電子信息系統(tǒng)機房設計規(guī)范GB50174-2008》,電子信息系統(tǒng)機房應對人流和出入口進行安全考慮,以下敘述錯誤的是( )。
A.建筑的入口至主機房應設通道,通道凈寬不應小于1.5m
B.電子信息系統(tǒng)機房宜設門廳、休息室、值班室和更衣間
C.電子信息系統(tǒng)機房應有設備搬入口
D.電子信息系統(tǒng)機房必須設置單獨出入口
計算機信息系統(tǒng)集成企業(yè)資質的三、四級證書應( )。
A.由工業(yè)和信息化部印制,由各省市系統(tǒng)集成企業(yè)資質主管部門頒發(fā)
B.由各省市系統(tǒng)集成企業(yè)資質主管部門印制,由工業(yè)和信息化部頒發(fā)
C.由工業(yè)和信息化部認定的部級資質評審機構印制和頒發(fā)
D.由工業(yè)和信息化部認定的地方資質評審機構印制和頒發(fā)
( )由電纜連接器和相關設備組成,把各種不同的公共系統(tǒng)和設備連接起來其中包括電信部門的光纜,同軸電纜,程控交換機等。
A、建筑群子系統(tǒng)
B、設備間子系統(tǒng)
C、垂直干線子系統(tǒng)
D、工作區(qū)子系統(tǒng)
Modern computers based on ( ) are millions to billions of times more capable than the early computers, which occupy a fraction of the space. Simple computers are small enough to fit into mobile devices, an mobile computers can be powered by small batteries. Personal computers in their various forms are icons of the Information Age and are what most people think of as ‘computers’.
A、Central Processing Unit
B、integrated circuits
C、Hard disk
D、software integration
以下有關變更控制方面的描述中,()是正確的
A、任何變更都要得到三方(建設單位,監(jiān)理單位和承建單位)的同意,嚴禁擅自變更
B、承建單位或建設單位是變更的申請者,監(jiān)理方不能提出變更申請
C、承建單位提出變更申請,一般應首先遞交業(yè)主初審,同意后再確定變更方法
D、建設單位不能提出變更申請
某軟件開發(fā)項目的需求規(guī)格說明書第一次正式發(fā)布,命名為《需求規(guī)格說明書V1.0》,此后經過兩次較小的升級,版本號升至V1.2,此時客戶提出一次需求變更,項目組接受了變更,按客戶的要求對需求規(guī)格說明書進行了較大的改動并通過評審,此時版本號應升級為()
A、V1.3
B、V1.5
C、V2.0
D、V3.0
溫馨提示:因考試政策、內容不斷變化與調整,信管網網站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網軟考課程由信管網依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |